Wilbartec
  • Home
  • About Us
  • Projects
  • Kilns
  • Contact

Phone: (+61 2) 4296 4848   Email: admin@wilbartec.com.au

1044-P05 - 18-05-2014a

BOS/BOF Skirt Closure Support & Heat Shield Modifications

Location:

BHP Steel (now BlueScope), Port Kembla Works

Client Prerequisites:

Increase the service life of the skirt structure and skirt closure arrangement

The Project:

Wilbartec developed design modifications in order to increase the service life of the skirt structure and skirt closure arrangement.

• The modified skirt cooling pipe arrangement was designed & fabricated with substantially lower fabrication costs than the previous design.

• The newly designed skirt closure attachment lasted more than twice the number of heats than the original design. In addition, the modifications to the heat shields, reduced repair requirements and maintenance costs.

Outcomes:

Utilising the design modifications provided by Wilbartec, allowed BlueScope Steel to achieve cost reductions in parts manufacture and in ongoing maintenance. In addition, significant environmental advantage was gained from the new design with cleaner off-gas collection during the oxygen blowing process.

BOS/BOF Off-Gas Closed Circuit Cooling Water System DEVELOP COLOURFAST POOL PEBBLES

Related Posts

P9030024 copy

Projects

WHEN PERFORMANCE ART MEETS ENGINEERING

P5030203

Projects

BY-PRODUCT PROCESSING

28

Projects

CUSTOMISED PRODUCTION LINE DESIGN

    Site Search

    Recent Posts

    • WHEN PERFORMANCE ART MEETS ENGINEERING
    • BY-PRODUCT PROCESSING
    • CUSTOMISED PRODUCTION LINE DESIGN
    • DEVELOPMENT SUBSTRATE COATING PROCESS
    • WASTE REFRACTORY BRICK PROCESSING / RECYCLING
    Wilbartec logo white

    © Wilbartec 2017

    CONTACT US

    Mail:
    PO Box 88
    Oak Flats NSW 2529
    Australia

    Phone:
    (+61 2) 4296 4848

    Email:
    admin@wilbartec.com.au

    Pages

    • About Us
    • Contact
    • Home
    • Kilns
    • Projects